Bridge Raggebol - Dybbol – Construction of the Kliplev Motorways in Denmark
Service
Geometric design, construction details
Bridge 1
- Open span: 36,90 m
- Width between handrails: 4,50 m
- - Concrete roadbed
- - Pre-stressed frame
Bridges 2 and 3
- Open span: 37,38 m
- Width between handrails: 11,65 m
- - Conventional roadbed
- - Pre-stressed frame